OUR WORK
The Phase III Difference
Real jobs. Real results. From disaster to exceeding your greatest expectations — this is what Phase III Construction delivers for SE Michigan homeowners every single time.
All Work
Fire Restoration
Rebuild & After
Phase III Crew
After Restoration
Master bathroom rebuild — marble tile, soaker tub, walk-in rain shower
After Restoration
Full bathroom rebuild — glass slider shower, new vanity and fixtures
After Restoration
Complete exterior rebuild — new siding, roof, windows, and trim
Rebuild In Progress
Interior structural rebuild — coffered ceiling, open concept living
After Restoration
Kitchen rebuild — two-tone navy/white cabinetry, marble backsplash
After Restoration
Living room complete restoration — new floors, trim, windows
Fire Restoration
Fire damage roof rebuild — Phase III crew and telehandler on site
Fire Restoration
Fire damage exterior mid-restoration — house wrap and ice shield installed
After Restoration
Bedroom rebuild complete — new LVP flooring, paint, trim, windows
After Restoration
Full exterior siding replacement — new siding, deck, and black railing
After Restoration
Kitchen near completion — two-tone cabinets, marble backsplash, quartz
After Restoration
Complete exterior rebuild — white vinyl siding, new windows and door
After Restoration
Great room rebuild — vaulted ceiling, linear fireplace, hardwood floors
After Restoration
Completed fire restoration — Phase III on site through final walkthrough
Rebuild In Progress
Hardwood floor installation — Phase III crew mid-install
After Restoration
Custom tile shower — blue onyx large format tile, hexagon mosaic floor
Rebuild In Progress
Kitchen rebuild — gray shaker cabinets, black granite, diamond backsplash
After Restoration
Full bathroom rebuild — blue onyx tile, navy vanity, LED mirror
Rebuild In Progress
Ground-up rebuild — new foundation and framing
Phase III Crew
Phase III crew on-site — roof truss installation
After Restoration
Living room rebuild — acacia hardwood, fresh paint, barn door
After Restoration
Kitchen rebuild — gray shaker island, waterfall granite, stacked stone
After Restoration
Exterior rebuild — navy siding, stone veneer, new roof
Phase III Crew
Phase III crew framing — American flag flying on job site
Rebuild In Progress
Hip roof framing — full rebuild in progress
After Restoration
Bathroom rebuild — slate tile shower, frameless glass, built-in bench
Rebuild In Progress
Foundation and floor system — ground-up rebuild from scratch
Fire Restoration
Total loss demolition — Phase III handles full teardown and rebuild
Rebuild In Progress
Foundation pour — concrete truck on site, full ground-up rebuild
Your Home Deserves This.
Every photo above started with a disaster and a phone call. One call to Phase III starts everything — documentation, claims, rebuild, and a finished product that exceeds your greatest expectations.
(734) 237–7322
Available 24/7 — Wayne, Oakland, Washtenaw & Livingston Counties